Creation of an online store selling paintings in Almaty
Client: Holst
The date: 10.11.2018
CMS: opencart
A task:
- Provide the buyer with information about the product and the company
- Develop an individual conversion design
- Develop a fast website
- Organize a convenient and intuitive site structure
Client briefing:
We started with a brief that we completed together with the Client. In it, we disclosed information about the company, experience, directions, prospects and tasks.
The brief is the most important part of the project. Based on it, we create a website, and the client accepts the work.
Site prototype:
Based on the completed brief in the Axure RP program, we created 7 interactive pages of the site.
CREATING A PROTOTYPE WITH OUR SPECIALIST TAKED 38 HOURS
Upon completion of the prototypes, the Client was able to try himself as a client and go all the way from the main page to the registration of the application.
At the approval stage, the Client made adjustments to the main concept and all the content was brought to minimalism.
Design:
Developed design for an online storebased primarily on prototypes. The designer worked on the color scheme, fonts, photos, icons.
The Client already had a logo and color scheme that we had previously developed for his website. The design was approved almost immediately. There were some adjustments, but minor ones.
THE DESIGN PROCESS FROM THE DESIGNER TAKED 62 HOURS.
Programming:
- Preparing html layouts
- Adaptive layout
- Connecting html layouts to CMS Opencart
- Setting up and adjusting the mobile version
- Checking and fixing errors
After transferring all the pages, we connected the mailing system to the site. A field appeared on the site in which the client enters his email and he gets into the mailing system, which itself sends a chain of letters.
Set up email notifications for corporate mail. And we made a video and text instructions for filling the site. The manager himself adds all positions without the help of a programmer.
THE PROCESS OF LAYOUT AND STRETCHING ON THE CMS TOOK 43 HOURS FOR THE PROGRAMMER.
Testing:
Before Completion online store the manager checks the completed stages for compliance with the brief, rules for developing a prototype, design, requirements for HTML layout and linking layouts to the site.
Fill out the brief
Leave a request and we will send you a brief to fill out.